Last edited one year ago
by Demo writer

7 Normal operations

m ((username removed) (log details removed))
No edit summary
Tag: 2017 source edit
 
Line 1: Line 1:
<bookshelf src="Book:Emergency Manual" />
<bookshelf src="Book:Emergency Manual" />
After the damage event has been overcome, the crisis management team controls the transfer of the company to normal operations.
== Transition ==
The transition to normal operation takes place when the following statements are true:
* The cause of the damaging event has been eliminated,
* the damage was contained,
* it is no longer necessary for the crisis management team to deal with the damage event.
== Checklist for returning to normal operation ==
The following points should be considered when assessing the consequences of emergency operation:
* When will the crisis management team be dissolved and transferred to the normal line organization?
* What work backlogs have arisen?
* How will employees be informed of the progress of the return to normal operations?
* To whom should the organizational units report their progress during this time?
The information should be documented in the business continuity plan.

Latest revision as of 10:15, 3 February 2023

After the damage event has been overcome, the crisis management team controls the transfer of the company to normal operations.

7.1. Transition

The transition to normal operation takes place when the following statements are true:

  • The cause of the damaging event has been eliminated,
  • the damage was contained,
  • it is no longer necessary for the crisis management team to deal with the damage event.

7.2. Checklist for returning to normal operation

The following points should be considered when assessing the consequences of emergency operation:

  • When will the crisis management team be dissolved and transferred to the normal line organization?
  • What work backlogs have arisen?
  • How will employees be informed of the progress of the return to normal operations?
  • To whom should the organizational units report their progress during this time?

The information should be documented in the business continuity plan.

No categories assignedEdit

Discussions